Has anyone used project documents to build a multifamily job created in a BIM 3D model using Revet?
I would like to know-
How long the design process took from concept to construction documents?
How the cost of the documents was when compared to the traditional 2D CAD design method? I would think given the speed with which the Revet process speeds along there would be a significant savings on the design costs.
How did permitting go? Did Revet solve code issues like advertised?