Building a multifamily job created in a BIM 3D model using Revet?

Topic Author
Larry Watkins
14 years 3 weeks ago #4866 by Larry Watkins
Has anyone used project documents to build a multifamily job created in a BIM 3D model using Revet?

I would like to know-
How long the design process took from concept to construction documents?

How the cost of the documents was when compared to the traditional 2D CAD design method? I would think given the speed with which the Revet process speeds along there would be a significant savings on the design costs.

How did permitting go? Did Revet solve code issues like advertised?
14 years 3 weeks ago #4866 by Larry Watkins